Home / Services / Site Investigations

Site Investigations

Find out what’s in the soil and groundwater before you buy, sell, build or redevelop — with clear findings and practical next steps.

Sonic drilling rig on a site investigation

Experience on every scale

GEMEC has the professional experience and expertise to undertake the environmental investigation of your site. We have completed over 300 site investigations, from small residential properties to large (100 hectare) industrial sites.

From greenfield to contaminated sites

Investigations range from preliminary site investigations of ‘greenfield’ sites — establishing the site history and the potential for contamination — to detailed investigations of ‘brownfield’ and contaminated sites. These assess the chemical condition of:

  • soil and soil vapour
  • sediment
  • groundwater and surface water
  • ambient air

What we deliver

  • Preliminary Site Investigations (PSI)
  • Sampling and Analysis Quality Plans (SAQP)
  • Detailed Site Investigations (DSI)
  • Site Management Plans (SMP)
  • design and supervision of complex soil and groundwater drilling programmes
  • soil and groundwater sampling, including baseline and compliance monitoring

Buying or selling a site? See Due Diligence Assessments.

Examples on the public record

Cited by METRONET · 2020

Detailed site investigation — former BP Magnolia site, Bayswater WA

GEMEC completed a Detailed Site Investigation of the former BP Magnolia site for the Department of Communities in December 2019. The site was classified ‘Remediated – for restricted use’ in May 2020, and GEMEC’s findings are cited in the Bayswater Station and Turnback Project construction environmental management plan.

Read the Bayswater Station CEMP (published by the WA Government) →

Published report · 2008

Targeted soil investigation — former Shell service station, East Fremantle WA

GEMEC drilled 15 soil borings to 3.5 m across the former forecourt and tank area. Petroleum hydrocarbons (BTEX and TPH) were not detected; elevated lead was found at the former dispensing pumps, and GEMEC recommended targeted excavation and validation once the building was demolished.

Read the report (published by the WA Department of Planning) →

Drilling rig on a site investigation
Groundwater monitoring well installation

Related projects

Beckenham site remediated and subdivided

Soil remediation · Beckenham WA

Former bitumen manufacturing plant

4,300 m³ of contaminated soil excavated and bioremediated on site, with auditor sign-off achieved.

Bellevue on-site soil bioremediation

Soil remediation · Bellevue WA

Former service station and bulk fuel depot

9,100 m³ excavated from a 4,700 m² site — about half bioremediated on site, the rest at our facility.

Tilling contaminated soil for bioremediation

Soil remediation · 2010–2011

40,000 L crude oil soil remediation

Crude-oil-contaminated soil bioremediated to below WA commercial/industrial guideline levels.