Soil remediation · Beckenham WA

Former bitumen manufacturing plant, Beckenham

A 2.06 hectare former bitumen plant, remediated on site to achieve contaminated sites auditor sign-off.

Beckenham on-site soil bioremediation

GEMEC’s involvement with the site began with a detailed site investigation of the 2.06 hectare site. Following the investigation, the site was classified as ‘possibly contaminated – investigation required’ by the Department of Environment Regulation.

Because of a redevelopment proposal, the site required a mandatory auditor’s report prepared by an accredited contaminated sites auditor. GEMEC then carried out soil remediation works, excavating 4,300 cubic metres of contaminated soil. The soil was successfully bioremediated on site and used to backfill the excavations.

Following GEMEC’s successful remediation, the site achieved auditor sign-off.

Stages of the project

More projects

Bellevue on-site soil bioremediation

Soil remediation · Bellevue WA

Former service station and bulk fuel depot

9,100 m³ excavated from a 4,700 m² site — about half bioremediated on site, the rest at our facility.

Tilling contaminated soil for bioremediation

Soil remediation · 2010–2011

40,000 L crude oil soil remediation

Crude-oil-contaminated soil bioremediated to below WA commercial/industrial guideline levels.