Home / Projects / 40,000 L crude oil contaminated soil remediation

Soil remediation · November 2010 – May 2011

40,000 L crude oil contaminated soil remediation

Soil contaminated by a 40,000 litre crude oil release, bioremediated over six months.

Crude oil contaminated stockpile before remediation

Soil was remediated to below the Western Australian guidelines for the protection of the environment and human health in a commercial/industrial setting.

Stages of the project

More projects

Beckenham site remediated and subdivided

Soil remediation · Beckenham WA

Former bitumen manufacturing plant

4,300 m³ of contaminated soil excavated and bioremediated on site, with auditor sign-off achieved.

Bellevue on-site soil bioremediation

Soil remediation · Bellevue WA

Former service station and bulk fuel depot

9,100 m³ excavated from a 4,700 m² site — about half bioremediated on site, the rest at our facility.

Talk to an expert

A no-obligation discussion about your site.

Have a similar site?

Tell us about your site. We’ll give you a straight answer on what’s needed — there’s no obligation.