Experience on every scale
GEMEC has the professional experience and expertise to undertake the environmental investigation of your site. We have completed over 300 site investigations, from small residential properties to large (100 hectare) industrial sites.
From greenfield to contaminated sites
Investigations range from preliminary site investigations of ‘greenfield’ sites — establishing the site history and the potential for contamination — to detailed investigations of ‘brownfield’ and contaminated sites. These assess the chemical condition of:
- soil and soil vapour
- sediment
- groundwater and surface water
- ambient air
What we deliver
- Preliminary Site Investigations (PSI)
- Sampling and Analysis Quality Plans (SAQP)
- Detailed Site Investigations (DSI)
- Site Management Plans (SMP)
- design and supervision of complex soil and groundwater drilling programmes
- soil and groundwater sampling, including baseline and compliance monitoring
Buying or selling a site? See Due Diligence Assessments.
Examples on the public record
Detailed site investigation — former BP Magnolia site, Bayswater WA
GEMEC completed a Detailed Site Investigation of the former BP Magnolia site for the Department of Communities in December 2019. The site was classified ‘Remediated – for restricted use’ in May 2020, and GEMEC’s findings are cited in the Bayswater Station and Turnback Project construction environmental management plan.
Read the Bayswater Station CEMP (published by the WA Government) →
Targeted soil investigation — former Shell service station, East Fremantle WA
GEMEC drilled 15 soil borings to 3.5 m across the former forecourt and tank area. Petroleum hydrocarbons (BTEX and TPH) were not detected; elevated lead was found at the former dispensing pumps, and GEMEC recommended targeted excavation and validation once the building was demolished.
Read the report (published by the WA Department of Planning) →


Related projects

Former bitumen manufacturing plant
4,300 m³ of contaminated soil excavated and bioremediated on site, with auditor sign-off achieved.

Former service station and bulk fuel depot
9,100 m³ excavated from a 4,700 m² site — about half bioremediated on site, the rest at our facility.

40,000 L crude oil soil remediation
Crude-oil-contaminated soil bioremediated to below WA commercial/industrial guideline levels.
Talk to an expert
A no-obligation discussion about your site.
Spill emergency
