Soil remediation · Bellevue WA

Former service station and bulk fuel depot, Bellevue

9,100 cubic metres of contaminated soil excavated from a 4,700 square metre former fuel site.

Bellevue on-site soil bioremediation

Following demolition of the site infrastructure, GEMEC undertook soil remediation works on the 4,700 square metre site, excavating 9,100 cubic metres of contaminated soil.

About half of the soil was successfully bioremediated on site. The remainder was transported to our solid waste facility north of Perth, where it was also successfully bioremediated.

Stages of the project

More projects

Beckenham site remediated and subdivided

Soil remediation · Beckenham WA

Former bitumen manufacturing plant

4,300 m³ of contaminated soil excavated and bioremediated on site, with auditor sign-off achieved.

Tilling contaminated soil for bioremediation

Soil remediation · 2010–2011

40,000 L crude oil soil remediation

Crude-oil-contaminated soil bioremediated to below WA commercial/industrial guideline levels.